Rule 22 requires a coastal permit for the erection of a structure that is solid, extends more than 1,000 metres more or less parallel to the line of mean high water springs. Rule 21 requires a coastal permit for any activity involving the erection of a structure that impounds or effectively contains eight hectares or more of the coastal marine area. Within any Area of Significant Conservation ValueĪreas of Significant Conservation Value are defined in the Regional Coastal Plan. This is a controlled activity provided the activity complies with the standards and terms stated in the rule. Rule 13 of the Regional Coastal Plan requires a coastal permit to maintain, repair, replace, add to or alter any existing lawful structure, or any part of an existing lawful structure that is fixed in, on, under or over any foreshore or seabed, including any associated disturbance of the foreshore or seabed not allowed by rules 6 to 12. Rule 10 of the Regional Coastal Plan permits the undertaking of any activity on any structure, or any part of a structure that is fixed in, on, under or over any foreshore or seabed, provided the activity complies with conditions stated in the rule. Rule 8 of the Regional Coastal Plan permits the erection or placement of any temporary structure, or any part of a temporary structure that is fixed in, on, under or over any foreshore or seabed, including any associated disturbance of the foreshore or seabed, provided the activity complies with conditions stated in the rule. Rule 7 of the Regional Coastal Plan permits the removal or demolition of any structure, or any part of a structure that is fixed in, on, under or over any foreshore or seabed, including any associated disturbance of the foreshore or seabed, provided the activity complies with conditions stated in the rule. "Existing" means existing on existing at 29 June 1994 (the date the Proposed Plan was publicly notified). Rule 6 of the Regional Coastal Plan permits the maintenance, repair, replacement, extension, addition or alteration of any existing lawful structure, or any part of an existing lawful structure that is fixed in, on, under or over any foreshore or seabed, including any associated disturbance of the foreshore or seabed, provided the activity complies with conditions stated in the rule. Structures built or used in the coastal marine area See the Kapiti Coast District Plan, the Porirua City District Plan, the Wellington City District Plan, the Hutt City District Plan, the Upper Hutt District Plan, the South Wairarapa District Plan, the Carterton District Plan, or the Masterton District Plan. Structures outside the coastal marine area are controlled by rules in district plans. If the structure is above the line of mean high water springs, it is not in the coastal marine area. The erection, construction, placement, alteration, removal, or demolition of any structure anywhere in the coastal marine area is controlled in the Regional Coastal Plan. Wharves, jetties, breakwaters and seawalls are structures fixed in, on, under or over the foreshore or seabed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |